
49ġ42 DETAILED DESCRIPTION OF RECOMMENDED PLAN. 49ġ34 Selection of Environmentally Preferred Plan. 46ġ31 COMPARISON OF SELECTED ALTERNATIVES. 27 0Ĩ5 EVALUATION OF SELECTED ALTERNATIVES. 26Ĩ0 Perched Beach with Beach Restoration. 11Ģ9 EXISTING FEDERAL PROJECTS AND CORRECTIVE MEASURES.

5Ģ5 PRIOR STUDIES AND CORRECTIVE ACTIONS. Rights-of-Way, Outfall Extensions $ 34,596,000 Non-Federal Seawall Rehabilitation, Lands, Easements, Reduced Maintenance (Sandy Hook Park) $ 1,700,000įederal - Initial Fill, Advance Fill, Groin Notching $158,322,000 The recommended project provides for a protective and recreational beachĪlong the reach of shore between Sea Bright and Ocean Township (Section I ofĪuthorized project) and for notching 15 existing groins. Protection, agrees to all provisions contained in the Local Cost Sharing The local sponsor, the State of New Jersey Department of Environmental The estimated annual cost of interest, amortizationĪnd future nourishment is $21,454,000, with annual benefits of $36,700,000. Theįederal portion of the initial cost is $158,322,000 and the non-Federal The estimated initial cost of the recommended plan is $192,917,000.

Obtained from borrow areas offshore of Sandy Hook and Belmar, New Jersey. Material for construction and periodic nourishment of the project would be However, the recommended works will not protect property fromĭamage caused by storm surges in the Shrewsbury and Navesink Rivers. Wide berm at an elevation of 10 feet above MLW and a berm cap extending toĪn elevation of +12 feet above MLW, provides protection to upland propertyįrom erosion that would accompany a storm with a re-occurrence interval ofġ20 years. Shore of the considered reach with periodic nourishment of the new beach and Provides for the construction of a protective beach along the 11.8 miles of The plan recommended forĬonstruction yields the maximum benefits over cost (NED plan).

Evaluation of the alternatives was accomplished within theįramework of existing Federal laws and criteria. The report presents the evaluation of erosionĬontrol alternatives for providing protection from damage from storm wavesĪnd erosion. Mile reach of shore extending from Sea Bright to Ocean Township, Section I This report is a General Design Memorandum concerning the approximately 12 Water Resources Development Act of 17 November 1986 (PL 99-662).

The reach of the authorized projectĮxtending from Sandy Hook to Ocean Township (Section I) was modified by the The Federal project, Atlantic Coast of New Jersey from Sandy Hook toīarnegat Inlet Beach Erosion Control, was authorized by the River and HarborĪct of Jin accordance with reports printed in House Document No.ģ32, 85th Congress, Second Session. Government Printing Office, oftFs or ATLANTIC COAST OF NEW JERSEY Draft general design memorandum / Atlantic coast of New Jersey, Sandy Hook to Barnegat inlet, Beach erosion control project Section I - Sea Bright to Ocean Township / Main report and environmental impact statement
